Who pays for a balcony repair in an apartment building: me or the owners corporation
By Artigellence ·
In a Victorian apartment building, who pays turns on one question: is the damaged part common property, or part of your lot? The owners corporation must repair and maintain common property, while you must keep the exterior of your own lot in good and serviceable repair. If a notice is served on you, the clock is 28 days.
Call (03) 9122 8610
The question that decides who pays
It sorts them by what the damaged part is. Under the Owners Corporations Act 2006 (Vic), the owners corporation is the party that has to repair and maintain the common property, along with the fixtures, fittings and services connected to it.
Your own side of the ledger is narrower. Consumer Affairs Victoria says a lot owner must keep the exterior of their lot in good and serviceable repair, and that its appearance must not interfere with other owners' use and enjoyment of the property. So a cracked, rusting or spalling balcony slab could land on either side depending on how it is classified. The records I have checked do not say which one applies to balconies in general, so the answer for your building sits in your own plan and title documents.
Why you should not just book a tradie
If the balcony turns out to be common property, fixing it yourself is not an option, even if you are happy to pay. The Act says a lot owner must not repair, alter or maintain the common property of the owners corporation. Consumer Affairs Victoria repeats this for services that benefit more than one lot.
There is one exception. A lot owner can do the work if the owners corporation has expressly authorised them to carry out the repairs as its agent. Without that authorisation, you risk paying for work on something you were not allowed to touch. Waiting does not make the problem smaller, but acting without permission can still cause trouble.
The 28-day clock if the work is yours
Where the repair does fall to the lot owner, the owners corporation can serve a notice. The Act says the lot owner must carry out the works required by the notice within 28 days of service.
Consumer Affairs Victoria describes what happens if that window is missed: the owners corporation can perform the work without the owner's approval and charge the owner for the cost. That is why a notice should never sit in a drawer. If you get one, read what it says is being required, compare it with your lot boundaries, and respond well inside the 28 days.
Urgent work and disputes
The owners corporation does not always need to wait for a vote. The Act allows it to repair or maintain property it is responsible for where there are reasonable grounds to believe immediate expenditure is necessary to ensure safety or prevent significant loss or damage to persons or property. A balcony that looks structurally doubtful is the sort of situation where that might come up.
If you and the owners corporation cannot agree on who is responsible, the Act says VCAT may hear and determine a dispute arising under the Act, the regulations or the corporation's rules. It is a path worth knowing about before positions harden, though it should follow a written exchange, not replace one.
What to check before you make a call
Start with the documents that show where your lot ends. Ask the owners corporation manager, in writing, whether the affected balcony element is treated as common property or as part of your lot, and ask for that answer to be recorded. Keep photos with dates, and note any previous repairs.
Then raise it with the owners corporation before commissioning anything. If it is yours, you will have a clear brief for quotes. If it is theirs, you have asked the right party at the right time.
Artigellence is the marketing business that operates this site and writes its articles. It does not carry out the work described.
Thanks — we have your enquiry. Someone will be in touch shortly. Prefer to talk now? Call (03) 9122 8610.
Last reviewed · Updated · First published